Demolition of former Chromic Acid Manufacturing Plant

Services: Demolition Engineering, Project Management, Principle Designer
Location: Texas, USA
Project Value: $0.84m

The former Chromic Acid chemical manufacturing unit was built in the 1960’s with production ceasing in 2002. The plant contained a number of raw and finished chemicals within the tanks, vessels, dryer unit and pipework and also a number of LIVE electrical and mechanical equipment that fed the adjacent Chrome Oxide manufacturing unit.​

​The demolition phase comprised of the following activities:​

  • Carry out the safe demolition of the former Chromic Acid cell floor.​
  • Carry out the safe demolition of the former Chromic Acid tank storage area and dryer unit.
  • Co-ordination between the adjacent LIVE packing and shipping warehouse whilst maintaining production targets.​

 

​Mark’s dedication to delivering projects safely was paramount to the success of this project (the decommissioning phases of this project were carried out without any accidents or incidents), along with his commitment to not disrupting current manufacturing operations.